| Porselano |
| Laying Procedure |
| |
1. |
Please take tiles from the boxes simultaneously and dry lay on floor. |
|
| 2. |
Examine the dry laid tiles for uniformity of shade & size some amount of shade variation is inherent in all ceramic product. |
| 3. |
Alter reposition wherever required until a uniform acceptable blend is achieved. |
| 4. |
Number the tiles in the order laid, with a piece of chalk. |
| 5. |
Fix the tiles with the recommended adhesive in the same number order. |
| |
6. |
The Company bears no responsibility and any liability there of arising out of non-adhering to the laying procedure described. |
|
| |
7. |
The company bears no responsibility towards the tiles exposed to any outside processes like transfers, printing, firing etc. |
|
| |
8. |
Kindly look for the arrow (—›) on the back of the tile and follow the laying pattern as shown on the carton:- |
|
| Tile-Fixing Instructions |
| |
1. |
Plaster the surface of the floor to be tiled with a wood finish and complete the rendering and curing at least two weeks prior to tiling. DO NOT FIX TILES ON FRESH FLOOR. |
|
| |
2. |
Before fixing the tiles, lay them out in the desired pattern and make sure that they give an acceptable blend of colour and design. Also make sure that the tiles are acceptable to your satisfaction. Please note that certain amount of shade & size variation is inherent in all ceramic products. THE COMPANY WILL BEAR NO LIABILITY AFTER THE TILES ARE FIXED. |
|
| |
3. |
The company bears no responsibility towards the tiles exposed to any outside process like transfers, printing, firing etc. |
|
| |
4. |
For fixing floor tiles, we recommend the use of BAL–ENDURA tile fixing adhesives. For best results, follow the instruction provided along with the adhesives. |
|
| |
5. |
For fixing floor tiles using sand and cement, follow the instruction given below:- |
|
| |
|
| a. |
Use cement and sand mortar in the ratio of 1:3. Add some water to create a consistent paste. DO NOT USE NEAT CEMENT FOR FIXING TILES. |
| b. |
Once the mixing has been completed, do not add any further water and use the same within one hour. |
| c. |
Soak the tiles in clean water for at least 30 minutes before fixing. |
| d. |
Remove the tiles the water and allow them to drain to ensure that there is no film of water on the tile surface. |
| e. |
Apply the bedding material evenly and tap it firmly back into position to ensure proper contact between the tile and floor. |
|
|
| |
6. |
The work size which we try to maintain for better technical performance is
+ 2mm on an average. It is advisable to maintain a gap of 1-2mm between every two tiles to allow for possible expansion as per BIS/EN tolerance norms. |
|
| |
7. |
Wait for 24 hours after fixing the tiles. After this period, fill the joints with BAL- ENDURA GROUT. |
|
| |
8. |
Please note that the company does not accept any liability in case of problems arising out of non-adherence to these tiles instructions. |
|
| |
9. |
Please note that floor tiles are especially manufactured for use on the floor only. DO NOT FIX FLOOR TILES ON THE WALL. |
|
| |
10. |
For cleaning tiles, use water or diluted soap solution followed by water with soft, moist cloth or sponge. DO NOT SCRUB OR SCRATCH. |
|
| |
11. |
DO NOT USE ACID / ALKALI / SOLVENT / OILS / CLEANING POWDERS ETC. FOR CLEANING TILES. |
|
| |
|
NOTHING IN THESE INSTRUCTION IS A SUBSTITUTE
FOR GOOD WORKMANSHIP AND SUPERVISION |
|
| |
|